To enable further design development for the proposed new Lotus models additional space was required for the Styling team. The existing workshops were transformed into a third Studio, Mill Room, Paint Shop, Trim Shop and Offices. The works involved a completely new Mechanical and Electrical installation which comprised of the following:-
- Detailed M&E design
- General and Emergency Lighting
- General purpose power
- Switchgear & containment
- Fire Alarm System
- Data installation
- Compressed Air
- Air Conditioning
- Ventilation
- Hot and cold water supplies
- Heating installation
- Above ground drainage